Delays on the Bridge

1 01 2010

 

Excavation site at dusk

 

Work to lay the foundations for Balthazar Lemon’s bridge to the mainland hit a setback. The small headland to the south of the harbour had been determined as the best spot, facing where our brightest thinkers understand the mainland to be. However, this small headland turned out not to be rock, as first imagined. Excavations to put down support posts revealed wood. Work on the bridge has stopped because all of those involved were far more interested in finding out what this buried wood is from, than in building the bridge. Your humble editor is not a man of science, but feels the future should take precedent over the past.
 
Man hours have been lost in digging up the sandbank. This work has revealed the remains of a ship. A large one, as far as can be ascertained, although the vast majority remains buried. Already tales are flying around, filling the wreck with imagined treasures. I would like to assure readers that based on my observations, the ship is filled with mud, slime and old seaweed.
 
Plans to lay the bridge foundations are delayed, but I have been assured the work will continue.
 

Actions

Information

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s




%d bloggers like this: